DSA were appointed to complete the design, planning works, detailed drawings and on-site attendance for the Construction of a Brand New Village Hall and associated car parking. The project also included a new pedestrian and vehicular access from Moortown Road.
The building comprises Main Hall, Kitchen & Servery together with a Multi-purpose room, bar area and associated toilet facilities.
The building was constructed of reclaimed brickwork with use of local sourced ironstone for detailing to the front elevation. Also Integrated into the design was a ground source heat pump with over 1000m of underground pipework installed to the external grounds and heat pump and associated plant located in plant room serving under floor heating throughout.